Shelby Pedestrian Bridge
Stansell Electric was awarded an electrical contract that consisted of illuminating a 100+ year old landmark bridge as part of a $15 million renovation. Stansell was responsible for the installation of electrical switchgear, flexible conduit inside bridge beams, distribution boxes and wire to more than 800 locations, 730+ decorative light fixtures and removal of existing electrical and lighting structure.