Stansell Electric was awarded the underground portion of a large utility redesign for Denso Manufacturing Plant in Maryville, Tennessee. Denso’s plant has grown at such a rapid pace that their current substation can no longer sustain the buildings’ electrical demand.

Stansell made that possible by adding a 34,000 lb. concrete switch gear vault and a concrete encased duct bank inside of the substation tying together a new overhead line system paired with new transformers inside a renovated switch house.

Denso is now able to power more projects safely, efficiently, and continue to build most projects in East Tennessee.