Knoxville Multi-Use Stadium
Knoxville Multi-Use Stadium
The Knoxville Multi-Use Stadium is a state-of-the-art facility located right outside of Downtown, Knoxville. Designed to serve as a vibrant hub for sports and entertainment, this versatile stadium is a collaborative project involving Denark Construction, the City of Knoxville, Knox County, and Boyd Sports. The stadium features advanced infrastructure to support a variety of events, including baseball games, concerts, and community gatherings. With a focus on modern amenities and cutting-edge technology, the Knoxville Multi-Use Stadium aims to enhance the local cultural and recreational landscape, providing a premier venue for residents and visitors alike to enjoy diverse and dynamic experiences.
Project at a Glance
- Location: 501 E Jackson Ave, Knoxville, TN 37915
- Client: Denark Construction
- Partners: City of Knoxville, Knox County, Boyd Sports
About the Project
Stansell Electric was tasked with the intricate electrical and communications infrastructure for the highly anticipated Knoxville Multi-Use Stadium. Our scope included the installation of two major ductbanks, substantial conduit work, and coordination with multiple stakeholders. The first ductbank was a 10-way configuration housing 750MCM electrical cables from Knoxville Utilities Board, while the second was dedicated to fiber optic cabling for eight communications providers.
Project Scope and Achievements:
Ductbanks and Conduit Installation
- Installed over 20,400 linear feet of 6-inch conduit, 31,800 linear feet of 4-inch conduit, and 6,800 linear feet of 2-inch conduit.
- Positioned 56 concrete hand-holes and nine large electrical vaults, all buried 7 feet deep.
- Moved nearly 4,000 cubic yards of dirt and 4,500 tons of aggregate.
- Poured over 1,300 cubic yards of concrete.
- Completed these tasks in just over seven months.
Challenges and Solutions:
Utility Conflicts
- Encountered daily surprises with underground utilities.
- Managed to avoid significant disruptions.
Coordination and Collaboration:
- Successfully collaborated with our customers and fellow contractors to navigate complex interactions, overcoming challenges such as unknown underground conditions and limited space.
- Maintained a reputation for reliability by consistently completing tasks as promised and on schedule..
Paced Work Environment:
- Adapted to the fast-paced demands of the project, often requiring additional manpower on short notice.
- Demonstrated efficiency and independence, earning trust and reducing the need for close supervision.
Key Features:
Major Ductbanks:
Successfully installed two large ductbanks (8-way and 10-way), covering over 3,000 feet in less than seven months.
Overcame obstacles, showcasing resilience and problem-solving abilities.
Community Impact:
Played a crucial role in a project of high significance to the community, contributing to a landmark development in the Knoxville metropolitan area.
Reflective Insights:
The Knoxville Multi-Use Stadium project was not without its trials. Utility conflicts were a constant challenge, and the fast-paced nature required timely adaptation. However, through steadfast commitment and clear communication, we proved our reliability and capability. In summary, the Knoxville Multi-Use Stadium project highlights Stansell Electric’s expertise, resilience, and ability to deliver within time constraints, leaving a legacy of quality work and satisfied partners.